Interactive Tool
I&I ROI Calculator
Test a sewer basin against a 5,000 GPD/IDM infiltration and inflow limit, then see what a rehabilitation program costs and what it avoids.
Basin Inputs
Pipe
yr
Conditions
Program
Enter Your Basin to See Results
A basin name, mainline length, laterals and average age are all it takes. Everything else has a default.
